fbpx

Blumar Seafoods – Chile

THE BUILDING

CLIENT:

Blumar Seafoods

LOCATION:

Punta Arenas, Chile

CATEGORY:

Insulated metal panels, doors and accesories.

DATE:

february 2019

DIMENSIONS

WIDE:

109 ft.

LENGTH:

71 ft.

HEIGHT:

23.5 ft.
DCIM100MEDIADJI_0032.JPG

THE CUSTOMER

Client Description:

Blumar Seafoods, through our partner Allied Steel Buildings. We supplied products and materials for two buildings that were to be used for salmon processing in Chile, so insulated panels and accessories specifications needed to comply with the applicable food regulation. Also, fire doors were delivered. We gave an additional training service for insulated panels installers. Also installation process supervision was provided.

THE PROJECT

  • Insulated rock wool panels for sectorizing (3 in.)
  • Insulated acoustic rock wool panels (3 in.) Microperforated
  • Insulated panels for roof. Rock wool core. 5 crowns (3 in.)
  • Roll up fire doors (EI-60)
  • Swing doors (IN 2)
  • Fire doors
  • Handrail tramex
  • Grating tramex
PROJECT fire-doors-for-food-processing-project-in-Chile
TIME Insulated-rockwool-panels-installed-on-salmon-processing-facilities

TIME

  • Proposal accepted on february 2019
  • Order completed on July 2019

MORE ABOUT THIS PROJECT

  • CIF Incoterm shipping
  • On site installation training
  • Installation supervision

Subscribe

Get updates about new materials, products, and solutions.